Nouaceur · Morocco · Completed

SOPLAMI plant

Aerospace plant on the Nouaceur technology park: thermoforming and shaping of plastics. 2,500 m² of structural works in 6 months.

SOPLAMI plant — Nouaceur · Morocco (1/16)

SOPLAMI plant · Nouaceur · Morocco 1 / 16

The constraint

An aerospace plant on the ONDA technology park: the structural works schedule drives the installation of the thermoforming machines, and therefore the start of production.

Our answer

2,500 m² of structural works, roof structure and cladding included, run with around sixty people on site.

The outcome

Delivered in six months, within the manufacturer’s installation schedule.

Project at a glance

Key figures for SOPLAMI plant
PurposePlant for thermoforming and shaping plastics for the aerospace industry
LocationONDA technology park, Nouaceur
ScopeStructural works, 2,500 m² built
Duration6 months
Workforce60 people

A plant for thermoforming and shaping the plastic parts used by the aerospace industry, built on the ONDA technology park in Nouaceur.

K-Stone delivered the structural works package: 2,500 m² of floor area, roof structure and cladding included, in six months, with around sixty people on site.

This project is run the way every project is run at K-Stone Construction: one point of contact, a quote prepared by the company director, a stable site team and a weekly review until handover.

Current status: Completed. For construction details, quantities or comparable references, write to contact@k-stoneconstruction.com or call +212 5 22 24 90 15.

We build this type of structure anywhere in Morocco, including remote sites and sites that stay in operation during the works. Supervisors travel with the crews, quantities and site records are kept up to date project by project, and the handover file is delivered complete: as-built drawings, minutes, snag clearing.

Method

How we run a project.

You speak directly to the person who decides and prices the work. No sales desk between your need and the technical answer.

Step 1

Listening

Understanding the real need before talking price.

Step 2

Pricing

The quote is prepared by the director. Options worked out with you.

Step 3

Construction

A stable site team, a weekly progress review.

Step 4

Handover

Snags cleared, minutes signed, records filed. We finish cleanly.

More projects

Also worth a look

All projects

Contact

A similar structure to build?

RIVA Building, Guéliz · Marrakech · +212 5 22 24 90 15

Request a quote
Message us on WhatsApp