The constraint
Island projects where everything arrives by boat or by plane, spread across Annobón, Corisco, Malabo and Bata: nine structures of different kinds, far from any logistics base.
Annobón, Corisco, Malabo, Bata · Completed · 2018
Airports, a stadium, a terminal, a church, a grandstand and lodges on the islands of Annobón and Corisco, in Malabo and in Bata. Client: SOMAGEC GE.
Works in Equatorial Guinea · Annobón, Corisco, Malabo, Bata 1 / 38
Island projects where everything arrives by boat or by plane, spread across Annobón, Corisco, Malabo and Bata: nine structures of different kinds, far from any logistics base.
Logistics, storage and crew rotation organised from Morocco, with supervisors on site for the whole duration of the works.
A series of structures delivered in 2018 for SOMAGEC GE, in four locations across the country: airports, a stadium, a terminal, a church, a grandstand, a footbridge and lodges.
| Year | 2018 |
|---|---|
| Client | SOMAGEC GE |
| Country | Equatorial Guinea |
| Structures | Annobón airport and stadium, Corisco church and terminal, Corisco lodges, the tree, footbridge and grandstand in Malabo, Bata airport |
A series of works carried out in Equatorial Guinea in 2018 for SOMAGEC GE: the airport and stadium on the island of Annobón, the church and terminal on Corisco, the Corisco lodges, the tree, footbridge and grandstand in Malabo, and Bata airport.
Island sites, where everything arrives by boat or by plane: logistics, storage and crew rotation matter as much as the technical work.
This project is run the way every project is run at K-Stone Construction: one point of contact, a quote prepared by the company director, a stable site team and a weekly review until handover.
Current status: Completed · 2018. For construction details, quantities or comparable references, write to contact@k-stoneconstruction.com or call +212 5 22 24 90 15.
We build this type of structure anywhere in Morocco, including remote sites and sites that stay in operation during the works. Supervisors travel with the crews, quantities and site records are kept up to date project by project, and the handover file is delivered complete: as-built drawings, minutes, snag clearing.
Method
You speak directly to the person who decides and prices the work. No sales desk between your need and the technical answer.
Understanding the real need before talking price.
The quote is prepared by the director. Options worked out with you.
A stable site team, a weekly progress review.
Snags cleared, minutes signed, records filed. We finish cleanly.

Contact
RIVA Building, Guéliz · Marrakech · +212 5 22 24 90 15
Request a quote