Scanner building and external works at Mohammed V Airport, all trades included. 1,500 m² built in 8 months.

ONDA scanner building — Mohammed V Airport · Nouaceur (1/23)

ONDA scanner building · Mohammed V Airport · Nouaceur 1 / 23

The constraint

Building inside an airport that stays fully operational: controlled access, imposed working hours, no acceptable disruption to traffic at Mohammed V Airport.

Our answer

All trades across 1,500 m², 45 people on site, constant coordination with the operator for every noisy or bulky phase.

The outcome

Scanner building and external works delivered in eight months, in continuous coordination with ONDA.

Project at a glance

Key figures for ONDA scanner building
PurposeScanner building and external works
LocationMohammed V Airport, Nouaceur
ScopeAll trades, 1,500 m² built
Duration8 months
Workforce45 people

Construction of a scanner building and its external works at Mohammed V Airport, for the Moroccan national airports authority.

All trades were handled by K-Stone across 1,500 m² of floor area, inside an airport that stayed fully operational: controlled access, imposed working hours, constant coordination with the operator. Eight months of work.

This project is run the way every project is run at K-Stone Construction: one point of contact, a quote prepared by the company director, a stable site team and a weekly review until handover.

Current status: Completed. For construction details, quantities or comparable references, write to contact@k-stoneconstruction.com or call +212 5 22 24 90 15.

We build this type of structure anywhere in Morocco, including remote sites and sites that stay in operation during the works. Supervisors travel with the crews, quantities and site records are kept up to date project by project, and the handover file is delivered complete: as-built drawings, minutes, snag clearing.

Method

How we run a project.

You speak directly to the person who decides and prices the work. No sales desk between your need and the technical answer.

Step 1

Listening

Understanding the real need before talking price.

Step 2

Pricing

The quote is prepared by the director. Options worked out with you.

Step 3

Construction

A stable site team, a weekly progress review.

Step 4

Handover

Snags cleared, minutes signed, records filed. We finish cleanly.